Navigate Left
  • This is a 100% satirical article. Graphic generated by Ariana Powell using Adobe Firefly on April 25.

    'The Big Dipper'

    Black Plague on-campus: RUN!!!

  • Molly Myers, managing editor of The Orion, sticks out her thumb on 9th street in Chico, California. Screenshot taken from The Orions video on hitchhiking.

    Features

    Hitchhiking in Chico: a woman’s perspective on trust and adventure

  • Student Isaac Potkin introducing his arrangement of Indiana Jones during the wind ensemble concert. Taken by Jessica Miller on April 27.

    Arts & Entertainment

    Chico State Wind Ensemble gives cinematic performance

  • Chico State pitcher Amelie Valdez celebrates with first baseman Destiny Sevilla. Taken by Aaron Draper

    Sports

    Wildcats softball closes out season, celebrate senior day

  • One of the many painted denim squares featured throughout the Denim Day Resource Fair and Museum. Taken by Nadia Hill on, April 24.

    Arts & Entertainment

    WellCat Safe Place hosts Denim Day Resource Fair and Museum

Navigate Right
Breaking News
Chico State's independent student newspaper

The Orion

Chico State's independent student newspaper

The Orion

Chico State's independent student newspaper

The Orion

New science building to begin construction

The+plans+for+replacing+Siskyou+Hall+have+been+proposed+since+last+semester.+Photo+credit%3A+Natalie+Hanson
The plans for replacing Siskyou Hall have been proposed since last semester. Photo credit: Natalie Hanson

The construction of a new physical science building on campus will be initiated in fall of 2018, as announced in a university news release Thursday.

The new building will be replacing Siskiyou Hall, after this building is demolished.

“The building will provide advanced teaching labs for the sciences, enhanced hands-on learning and real-world research opportunities, increased opportunity for cross-disciplinary partnerships and greater campus exposure to science,” the news release stated.

The estimated cost for the 110,200-square-foot building is $101 million, with an expected completion for fall of 2020.

“Chico State students and faculty will find the building design energetic and interactive, providing an environment that is supportive of applied learning and research,” President Gayle E. Hutchinson said in the news release.

Hutchinson previously unveiled photos of the building at her address to the campus Monday.

Alejandra Fraga can be reached at [email protected] or @alifragster on Twitter.

Leave a Comment
More to Discover

Comments (0)

All The Orion Picks Reader Picks Sort: Newest

Your email address will not be published. Required fields are marked *